The renovation of a former Sears building involved a comprehensive overhaul, with complete interior demolition. The project entailed removing the existing roof and raising both the roof and walls by 40 feet to accommodate a movie theater on the second floor. Installation of underground and overhead utilities was executed, along with preparing existing shell spaces for future tenants. A finished mall circulation area on the first floor was completed to provide access to the existing mall. The highlight of the renovation was the construction of the 14-screen stadium seating Cinemark movie theater on the second floor.
Cinemark Galleria Mall 14 and XD
Project Overview
Project Details
Roseville, California
Location
Theaters
Project Type
Negotiated GMP
Delivery Method
138,700 SF
Project Size
The Team
Seritage SRC Finance, LLC
Owner/Client
Retail Design Collaborative
Architect
Tildin Engineering
Engineer
Paul Miller
Project Manager